There are some errors in the clips shown in the video and pictures, such as the wrong position of the break. These issues will be resolved on the project given to you.
Material:
Epoxy, clay, sand, stone, LED lights, hot melt adhesive, acrylic paint
Ship from:
China
Production time:
about 10 days
Logistics time:
Depends on pickup location
Logistics company:
China Post EMS
Package:
· Five-layer extra hard aviation special box
· EPE pearl cotton foam board
· air cushion
Special Note:
1. The weight of the product includes packaging materials;
2. Due to hand-made reasons, the production time may be longer than expected;
3. I do not provide batteries for works that require batteries due to logistics needs;
4. Because it is handmade, every piece of work cannot be exactly the same;
5. All goods do not accept return and exchange services for any reason.
100%
0%
0%
User Comments(0)